Trial Details

Not Recruiting
Basic Information
Clinical ID c2615
Identifier ACTRN12619001336178
Trial Title Using C-reactive protein (CRP) for earlier detection of Infectious complications following Colorectal Surgery
Trial URL Visit Original Page
Study Information
Study Results

Yes

Conditions Colorectal Cancer;Diverticular disease;Inflammatory Bowel Disease; Colorectal Cancer Diverticular disease Inflammatory Bowel Disease;Surgery - Other surgery;Cancer - Bowel - Back passage (rectum) or large bowel (colon);Oral and Gastrointestinal - Inflammatory bowel disease
Interventions Prospective, non-randomised, non-blinded clinical trial comparing two patient groups over two consecutive time periods. Group 1 (Standard Care) Patients have CRP levels measured on postoperative days 3 to 5 via a simple peripheral venous blood test which will be collected by a phlebotomist or doctor from the surgical team. A septic screen is performed based on the patients clinical status (vital signs, examination findings) rather than CRP alone. Group 2 (CRP protocol group) - Patients have CRP levels measured on postoperative days 3 to 5 as for Group 1. If the CRP value is above certain thresholds on these days (>170mg/L on day 3, >125mg/L on day 4, or >50mg/L increase between day 3 and 4, or between day 4 and 5), a 'septic screen' will be performed on the same day to look for a source of infection regardless of normal vital signs or examination findings. This will include: - CT scan of the abdomen and pelvis - Chest x-ray - Cultures of urine, wound and blood/central lines Fidelity of this data will be ensured through prospective collection of CRP data and complications and further assessed through audit of electronic records and hospital notes at the end of the study.
Participant Information
Sponsor Lyell McEwin Hospital
City -
Country/Region Australia
Enrollment Criteria
Sex Requirement ALL
Age Requirement ADULT, ELDER, OLDER_ADULT
Study Design
Study Type Interventional
Phase Not Available
Time Information
Start Date 2025-04-24
Primary Completion Date 2021-12-21
Completion Date 2020-09-10