Trial Details
Not RecruitingBasic Information
| Clinical ID | c3124 |
|---|---|
| Identifier | EUCTR2013-002428-17-DK |
| Trial Title | Nurse Administered Propofol Sedation vs combined sedation with midazolam/fentanil for colonoscopy in patients with IBD. A randomised controlled trial of satisfaction and adhearence to treatment program. - Propofol vs. standard sedation for colonoscopy. A study on satisfaction |
| Trial URL | Visit Original Page |
Study Information
| Study Results | No results available |
|---|---|
| Conditions | Satisfaction with sedation during colonoscopy in patients with inflammatory bowel disease MedDRA version: 14.1_Level: LLT_Classification code 10049683_Term: Monitored anesthesia care sedation_System Organ Class: 100000004865_;Therapeutic area: Analytical, Diagnostic and Therapeutic Techniques and Equipment [E] - Anesthesia and Analgesia [E03] |
| Interventions | Trade Name: Propofol B. Braun Product Name: Propofol B. Braun Pharmaceutical Form: Emulsion for infusion INN or Proposed INN: Propofol CAS Number: 2078-54-8 Other descriptive name: PROPOFOL Concentration unit: mg/ml milligram(s)/millilitre Concentration type: equal Concentration number: 10- Trade Name: Midazolam B.Braun Product Name: Midazolam B. Braun Pharmaceutical Form: Solution for infusion INN or Proposed INN: MIDAZOLAM CAS Number: 59467-70-8 Concentration unit: mg/ml milligram(s)/millilitre Concentration type: equal Concentration number: 1- Trade Name: Fentanyl B. Braun Product Name: Fentanyl B. Braun Pharmaceutical Form: Solution for injection INN or Proposed INN: Fentanyl CAS Number: 437-38-7 Other descriptive name: FENTANYL Concentration unit: mg/ml microgram(s)/millilitre Concentration type: equal Concentration number: 50- |
Participant Information
| Sponsor | Gastroenheden D, Herlev Hospital |
|---|---|
| City | - |
| Country/Region | Denmark |
Enrollment Criteria
| Sex Requirement | NOT SPECIFIED |
|---|---|
| Age Requirement | - |
Study Design
| Study Type | Interventional clinical trial of medicinal product |
|---|---|
| Phase | Not Available |
Time Information
| Start Date | 2025-04-24 |
|---|---|
| Primary Completion Date | - |
| Completion Date | - |