Trial Details
RecruitingBasic Information
| Clinical ID | c3129 |
|---|---|
| Identifier | DRKS00004935 |
| Trial Title | Attitudes towards eCommunication_in treatment of chronically ill patients _ - EC@T |
| Trial URL | Visit Original Page |
Study Information
| Study Results | No results available |
|---|---|
| Conditions | Chronic back pain_Chronic ischemic heart disease_Diabetes mellitus, type 1_Inflammatory bowel diseases_Depressive disorders_Anxiety disorders_Alcoholism_Breast cancer M54 I25 E10 K50.0 K50.1 K50.8 K50.9 K51.0 K51.2 K51.3 K51.4 K51.5 K51.8 K51.9 F32.0 F32.1 F32.2 F40 F41 F10.2 C50;Dorsalgia;Chronic ischaemic heart disease;Type 1 diabetes mellitus;Crohn disease of small intestine;Crohn disease of large intestine;Other Crohn disease;Crohn disease, unspecified;Ulcerative (chronic) pancolitis;Ulcerative (chronic) proctitis;Ulcerative (chronic) rectosigmoiditis;Inflammatory polyps;Left sided colitis;Other ulcerative colitis;Ulcerative colitis, unspecified;Mild depressive episode;Moderate depressive episode;Severe depressive episode without psychotic symptoms;Phobic anxiety disorders;Other anxiety disorders;Malignant neoplasm of breast;K50.0;K50.1;K50.8;K50.9;K51.0;K51.2;K51.3;K51.4;K51.5;K51.8;K51.9;F32.0;F32.1;F32.2;F10.2 |
| Interventions | Group 1: The EC@T-project consists of three substudies: two qualitative and one quantitative study. In all three studies there will be two sample groups, providers and chronically ill patients (see fulfilling one of the diagnoses). First, within the qualitative study we will interview the attitudes of patients and providers and we are planning to generate items for the EC@T questionnaire. Then all participants will fill out the questionnaire. |
Participant Information
| Sponsor | Uniklinikum Freiburg, Institut f Qualitsmanagement und Sozialmedizin |
|---|---|
| City | - |
| Country/Region | Germany |
Enrollment Criteria
| Sex Requirement | ALL |
|---|---|
| Age Requirement | ADULT, ELDER, OLDER_ADULT |
Study Design
| Study Type | observational |
|---|---|
| Phase | Not Available |
Time Information
| Start Date | 2025-04-24 |
|---|---|
| Primary Completion Date | - |
| Completion Date | - |