Trial Details
RecruitingBasic Information
| Clinical ID | c3156 |
|---|---|
| Identifier | JPRN-jRCT1092220114 |
| Trial Title | A study of total gastrointestinal screening by a single capsule endoscopy with magnetic navigation - MAGNAVICE |
| Trial URL | Visit Original Page |
Study Information
| Study Results | No results available |
|---|---|
| Conditions | Gastrointestinal Malignant Tumor, Gastric or Duodenal Ulcer, Gastrointestinal Bleeding,_Gastrointestinal Benign Tumor, Inflammatory Bowel Disease, Gastrointestinal screening |
| Interventions | Intervention type:DEVICE Name of intervention:Comparative study between capsule endoscopy and conventional endoscopy on the accuracy and acceptability of gastrointestinal screening Dose form / Japanese Medical Device Nomenclature:DEVICE Capsule endoscopy Route of administration / Site of application:ORAL Dose per administration:1 1 1/unit Dosing frequency / Frequency of use:ONCE ONCE/Examination Planned duration of intervention:8 hours (after ingesting a capsule endoscope) Intended dose regimen:Preparation before and after(booster) ingesting a capsule endoscope, Lubiprostone intake after passing stomach detailes of teratment arms:Volunteers or digestive disease patients who underwent or will undergo upper and lower conventional endoscopy before or after a capsule endoscopy Comparative intervention name:Conventional endoscopic findings before or after capsule endoscopy Dose form / Japanese Medical Device Nomenclature:DEVICE Capsule endoscopy Route of administration / Site of application:ORAL Dose per administration:1 1 1/unit Dosing frequency / Frequency of use:ONCE ONCE Planned duration of intervention:Eight hours after ingesting a capsule endoscope Intended dose regimen:Preparation before and after(booster) ingesting a capsule endoscope |
Participant Information
| Sponsor | Hidetoshi Ohta |
|---|---|
| City | - |
| Country/Region | Japan |
Enrollment Criteria
| Sex Requirement | ALL |
|---|---|
| Age Requirement | - |
Study Design
| Study Type | Interventional |
|---|---|
| Phase | Not Available |
Time Information
| Start Date | 2025-04-24 |
|---|---|
| Primary Completion Date | - |
| Completion Date | - |